DC Kaufland Olomouc III-IV. etapa

Commencement of Assembly Work under Next Phase of DC Kaufland

Construction site

Construction site

  • Zadavatel: Kaufland
  • Datum realizace: 2009

Following a period of engineering preparation and finalization of the project, a decision was made to expand the Kaufland distribution centre in Olomouc. This investment is one of the few current investments into warehouse and logistics facilities because this construction segment is the one suffering the strongest slump in the time of the financial crisis. We are therefore glad that the budget calculation based on our design was acceptable and that thanks to our proposals the project was assessed as feasible. Together with the extended warehouse premises at one end of the current facility, a new freezer hall connected with meat processing operations will be built on the opposite side. Work is scheduled for completion by 15 December 2009.

Other pictures

  • Pillars Pillars
  • Pillar fork - detail Pillar fork - detail
  • Pillars, basket, drum Pillars, basket, drum
  • Extension of existing facilities Extension of existing facilities
  • Loading ramp bridge Loading ramp bridge
  • The beauty of shell structure The beauty of shell structure
  • Connection detail Connection detail
  • Joint detail Joint detail
  • Site meeting Site meeting
  • View of the hall View of the hall
  • Roof structure Roof structure
  • Platform bridge - completed Platform bridge - completed
  • Assembly work in progress Assembly work in progress
  • Outer claddings Outer claddings
  • View from west View from west