Home → References → Production and storage halls → SIWATEC Olomouc
Revitalization of the brownfields of Aquaindustrial s. r. o. in Olomouc-Chomoutov
Towards the end of 2008 and during the first half of 2009 we completed the production hall with office space for Aquaindustrial s. r. o. in Olomouc-Chomoutov.
This is a two-bay hall with dimensions of 30x39 metres and a height of 6.25 metres. The hall envelope is made of brick, with additional Styrodur insulation. The roof structure is formed by reinforced-concrete girders, completed with cassette panels. The roof includes two skylights. Half of the hall is equipped with a bridge crane, with a load-bearing capacity of 5 tonnes.
The contract also included adjustments to the surrounding area, i.e. a parking lot and roads.