VGP park Olomouc

Our company is involved in the construction of the VGP Park Olomouc logistics centre

Commencement of assembly

Commencement of assembly

  • Datum realizace: 2008

This is a four-bay hall with dimensions of 96×96 metres, and a clear height of 10 metres under the girder. The basic module grid is 12×24m, T shaped trusses with a span of 24 metres are placed with a spacing of 6 metres on the load-bearing girder. The hall is completed with a reinforced-concrete structure of 13 loading ramp bridges.
The hall includes a two-storey reinforced-concrete unit with dimensions of 12×24 metres, to which a third level is planned to be included in the future; therefore, the roof above the staircase consists of easily removable prefabricated components.
The reinforced-concrete structure consists of 513 reinforced-concrete elements in 13 type groups, to be completed in September.

 

Other pictures

  • Pocket for the fitting of pillars Pocket for the fitting of pillars
  • First pillars First pillars
  • Pillars Pillars
  • Assembly of the hall Assembly of the hall
  • View of the hall View of the hall
  • Heavy-duty equipment Heavy-duty equipment
  • Hall structure Hall structure
  • Hall structure Hall structure
  • Loading ramp bridge Loading ramp bridge